Requested by our friends at NewKota Service & Rentals, Freedom DMC was commissioned to build a highly efficient, ESG-centric well intervention unit. The design focus was to provide an alternative to conventional means for servicing the Frac Protect and light-remedial workover market. Collaboration between client and manufacturer is something we pride ourselves on here at Freedom DMC. Contact us today to learn more about this unique, innovative project!

Rod Jack Features
- Body load design for smaller footprint
- Custom designed deployment arm & lifting platform
- Proprietary slip/die mechanism (patented by NewKota)
- Zero emissions power unit
- 80K lbs. pull/ snub capabilities
- Wireless controls
- Custom GUI for setting operating parameters
- Data acquisition
- Numerous system redundancies

Custom user interface
At Freedom DMC we do all our own programming. Controller and PLC coding is integral to designing an efficient, capable piece of equipment. Tell us what you want it to do and we’ll make it happen!

Lifting platform
Working at height is one of the most dangerous processes encountered in the industry. A necessary evil when it comes to workover operations. Freedom designed an integrated, OSHA compliant lifting platform that eliminates the need for a man basket. Capable of reaching 40′, there are few beam pumps in the Bakken it can’t accommodate.

Wireless Controls
Optimal positioning for the operator was a key component requested by the team at NewKota.
A wireless control pack with the option of hydraulic back-up controls, allows the Supervisor to move freely around the wellhead while pulling rods.
